Metrology & Inspection: CMM, Interferometry, FAIR | Beaulic

Measured before shipped, documented in the box

Inspection is part of the process, not an afterthought. We measure the features that matter to your function — channel depth, flatness, port position, window parallelism — and ship the data with the parts.

Capability 05 — Metrology & Inspection

Inspection built around functional features

A dimensional report that lists everything except the feature your device depends on is noise. We agree the critical characteristics with you at drawing review, then build the measurement plan around them.

  • CMM & vision systems with 1 µm resolution for prismatic and 2D features.
  • White-light interferometry for channel depth, step height and surface roughness on transparent layers.
  • FAIR, PPAP-style lot reports and material certificates for regulated customers.
  • Transparent-part handling fixturing and probing strategies that measure plastic parts without clamping distortion.
Discuss your part
CMM inspection of a machined acrylic part
Process route

How we run it, step by step

Specifications

Process envelope

Typical values. Tighter limits are available after a drawing review — share the functional requirement rather than a blanket tolerance.

Parameter Standard Precision / achievable Notes
CMM / vision resolution1 µm—Temperature-controlled inspection area
Channel depth verification±10 µm±5 µmWhite-light interferometry
Flatness verification2 µm / 50 mm—Optical flat or interferometry
Report formatsdimensional report, C of CFAIR / PPAP-styleAgreed at drawing review
SamplingAQL 1.0 default100% on critical featuresPer agreement
Compliance documentsRoHS / REACH declarations—Full material traceability
Applications

Where this process earns its keep

  • Regulated medical & IVD programs Documentation structured for your design control and audits.
  • Optical & photonics parts Transmission, parallelism and surface data attached to every lot.
  • Microfluidic consumables Channel depth and port position statistics for bonding process control.
  • Export shipments Certificates and reports formatted for your customs and quality teams.
Inspection area with CMM and vision measuring systems

Send the drawing, get a process answer

Every RFQ is reviewed by a process engineer — expect a reply within one business day, with the route we would run and where cost can be removed.

Request a Quote